kitchen install finito, well sorta

Woot! Friday afternoon they’d finished. Well sort of, there was the little issue of no hot water in the kitchen and the canopy rangehood not installed and a shelf missing. However for two days worth of installation, not bad at all. Today The Son and I spent most of the day patching and painting the kitchen where the walls had come down and painting the ceiling. Hard yakka.

So here’s some pics, again, over to flickr for details.

Kitchen_install_finished_301

Kitchen_install_finished_201

Kitchen_install_finished01

Next up blinds, floor covering and toilet renovation.

13 thoughts on “kitchen install finito, well sorta

  1. Sarah says:

    I’m so friggin’ jealous, I can’t even tell you. Two days?! I wish such a transformation of our kitchen were possible. Perhaps it is but I suspect it would require boat loads, veritable cargo ships, of money.

    Like

  2. Claire says:

    What a transformation! We’re doing out kitchen right now… installing ourselves though so who knows how long that will take. Thanks for sharing the pics.

    Like

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s